Search results  88  in 485,9 ms
           
No Download/Name Doctype Lang Format Size
1 Edgeson House Case Studies English pdf 0,24 MB
Edgeson House

Short description

This 1960’s residential block is one of many council tenanted blocks in the area. This particular building was suffering from a leaking felt roof as well as failing to meet current U-Values .

Date: 4/13/17
Edgeson House.pdf
Download pdf

2 Garrison Church, Edinburgh Case Studies English pdf 0,28 MB
Garrison Church, Edinburgh

Short description

A range of structural surfaces required effective refurbishment at St. Margaret’s Garrison Church in Edinburgh, and Liquid Plastics products were chosen on the basis of the fact that the company could provide a complete renovation package - a roofing system, a wall coating and a masonry protector.

Date: 4/13/17
Garrison Church Edinburgh.pdf
Download pdf

3 Great Marlow School, Buckinhamshire Case Studies English pdf 2,31 MB
Great Marlow School, Buckinhamshire

Date: 7/6/18
SLP Great Marlow School.pdf
Download pdf

4 Guild Hall Place, Cardiff Case Studies English pdf 0,31 MB
Guild Hall Place, Cardiff

Short description

The building’s original asphalt roof was completely degraded; it was saturated and there was extensive pooling on the roof. As a result, it was clear that the roof would have to be stripped back to the concrete deck and we proposed Sikalastic®-625 because the system’s rapid installation would mean we could get the roof watertight quickly with a system that is guaranteed to last at least 20 years.

Date: 8/14/17
SLP Guild Hall Place.pdf
Download pdf

5 Guildford Spectrum Case Studies English pdf 0,33 MB
Guildford Spectrum

Short description

Constructed in the 1980’s, the building has had continuous problems with leakage and water ingress from the moment it was built. Most recently it has suffered from leaking metal gutters.

Date: 4/13/17
Guildford Spectrum.pdf
Download pdf

6 Heathmans Road Case Studies English pdf 0,33 MB
Heathmans Road

Short description

This building houses offices used for a variety of different purposes and let out to individual tenants. The project involved two roof areas on two buildings within the complex. In both instances the roofs were
leaking and the asbestos substrate required encapsulation to prevent harmful fibres being released.

Date: 4/13/17
Heathmans Road.pdf
Download pdf

7 Heymann Primary & Nursery School Case Studies English pdf 0,77 MB
Heymann Primary & Nursery School

Date: 3/6/18
Sika Liquid Plastics Heymann Primary & Nursery School.pdf
Download pdf

8 Hilton Hotel, London Case Studies English pdf 3,47 MB
Hilton Hotel, London

Short description

In a residential area of West London, the Kensington Hilton Hotel in Holland Park had a roof which had been in place for 30 years but was now failing, causing leaks into the building below. Essex-based roofing contractors, Tower Asphalt Ltd, were chosen to refurbish the existing substrate to an exceptional standard with minimal disruption or noise to the hotel’s guests.

Date: 4/13/17
Hilton Hotel Kensington.pdf
Download pdf

9 Hull Royal Infirmary Case Studies English pdf 3,07 MB
Hull Royal Infirmary

Date: 4/13/17
Hull Royal Infirmary.pdf
Download pdf

10 Hungerhill School, Doncaster Case Studies English pdf 1,81 MB
Hungerhill School, Doncaster

Date: 7/6/18
SLP Hungerhill School.pdf
Download pdf

11 Invicta House Case Studies English pdf 0,36 MB
Invicta House

Short description

The roof of Invicta House in Maidstone incorporates wide box gutters with new access points cut through the roof in order to access the gutters. A felt waterproofing system had originally been specified but on reflection was considered inappropriate for waterproofing the upstands. There were also concerns about the inherent dangers of using heat applied waterproof systems and heat guns.

Date: 4/13/17
Invicta House.pdf
Download pdf

12 Ivanhoe College - SLP Case Studies English pdf 3,41 MB
Ivanhoe College - SLP

Date: 7/6/18
SLP Ivanhoe College.pdf
Download pdf

13 Jus-Rol Main Factory Roof Case Studies English pdf 0,31 MB
Jus-Rol Main Factory Roof

Short description

The building was suffering from water ingress in many areas and as the asbestos roof was quite fragile, they required an encapsulation system to be applied.

Date: 4/13/17
LP Jus-Rol 15.pdf
Download pdf

14 Kings Ford School Case Studies English pdf 0,30 MB
Kings Ford School

Short description

The original asphalt roof of Kings Ford Junior School was leaking and a new waterproofing system was required, with the addition of insulation so that the school could meet current building regulations. However, the exterior detailing to the original roof had been painted white, giving the roof a distinctive appearance, and the client did not want the addition of insulation to alter this appearance.

Furthermore the budget would not allow for all roof areas to be completed so the works needed to be phased over two years.

Date: 4/13/17
Kings Ford School.pdf
Download pdf

15 Kingswode Hoe School, Colchester Case Studies English pdf 0,29 MB
Kingswode Hoe School, Colchester

Short description

The existing asphalt roof had failed and required refurbishment during term time whilst the pupils were using the buildings below.

Date: 4/13/17
LP Kingswode Hoe School.pdf
Download pdf

16 Lancaster University Chaplaincy Centre Case Studies English pdf 2,19 MB
Lancaster University Chaplaincy Centre

Date: 3/6/18
Sika Liquid Plastics Lancaster University chaplaincy centre.pdf
Download pdf

17 Liddall House Case Studies English pdf 0,29 MB
Liddall House

Short description

This building is currently used as an office block for local authority staff. The existing roof was in a very poor condition and did not meet Part L regulations. A new waterproofing system was required, as well as an insulation upgrade and replacement roof lights.

Date: 4/13/17
Liddall House.pdf
Download pdf

18 Manchester Airport, Terminal 1 Case Studies English pdf 0,33 MB
Manchester Airport, Terminal 1

Short description

There were two phases of works required at terminal 1, the first being a series of asphalt roofs that had failed. The main problem here was the presence of a great deal of plant equipment, which meant that the only system that could successfully waterproof the area would be a liquid applied system.

Date: 4/13/17
LP Manchester Airport.pdf
Download pdf

19 Manchester Place, Apartment Blocks, Norwich Case Studies English pdf 1,12 MB
Manchester Place, Apartment Blocks, Norwich

Date: 3/6/18
Sika Liquid Plastics Manchester Place Apartment Blocks.pdf
Download pdf

20 Manchester Town Hall Case Studies English pdf 3,05 MB
Manchester Town Hall

Short description

The Town Hall’s original asphalt roof was no longer fit for purpose due to its age. There were problems with water pooling and water ingress that threatened the fabric of the building and a new roofing solution needed to be found.

Date: 4/13/17
Manchester Town Hall.pdf
Download pdf